HVAC
Building Control
Fire Safety
Your friend in indoor comfort & safety systems
Home Company Services Case Studies References Agencies Daikin-Vrv Handbook Fires / Hotels AskHvacMan Links Save Energy Contact Us
Fires &
Dictionary
Fire ABCs
Sprinklers
Some Fire Cases
Fire Books
Software
FireBoard
Hotels

Big Hotel Fires

Fire Safety
Detection
Suppression
Hotel Fire Case
Inspection
How to Survive
FireStats
Big Hotel Fires
Hotel Fire Cases
Fire Hazard Classification
Hotel Sprinkler Systems

Hotel Fire News

Special Fires
Hotel Fires
Ship Fires
Industrial Fires
Hospital Fires
Warehouse Fires

Restaurant/Nightclub Discotheque-Fires

High Rise Fires
Airport Fires
Fires
Fires ABC
Big Building Fires
Book About Fires
Fire Stats
Fire Board

Books About Fires

Fire Exit Systems
Software About Fires
Fire Sprinkler Software
Fire Egreess Software
Fire Modelling Software
Sprinkler
What is Fire Sprinkler
Success Stories
Sprinkler Manufacturers
Fire Pump Manufacturers
Standar for Sprinkler Systems
Sprinklered Hotels

Books About Sprinkler

Glossary
Definitions
Manufacturers
Basic
Why
Systems
Public Entry
Recration Areas
 Retail Areas
 Function Spaces
 Guestrooms
Hauskeeping
Elavators
Foods & Beverage
Mechanic Systems
Fire Protection
Kitchen
Site Development
 

Interstate Bank Building Fire;

LOGISTICS

The logistical considerations involved in this operation were massive. The 10th floor was used as the Staging Area for personnel and equipment. Crews would return to the Staging Area to rest and change air cylinders and then to await reassignment to a fire floor. Companies went into action with full air cylinders and returned to the Staging Area when they were out of air. The companies operated for approximately 20 minutes in each cycle and had approximately 20 minutes to rest and change air cylinders.

Without elevators, every piece of equipment had to be carried up the stairs, including approximately 600 air cylinders. Every firefighter entering the building carried hose, nozzles, and other tools up to the 10th floor. A stairwell support operation, with nine companies assigned, spent over two hours moving equipment from the street level, through an underground tunnel from a parking garage across the street, up to the lobby, and then up the stairs to the Staging Area.

Crews working below the fire worked under deteriorating, adverse conditions. Smoke began to fill the 10th and lower floors, and windows had to be broken for ventilation. Water cascaded down the stairways and through the ceilings; and electrical power, including emergency lighting in the stairs, was lost. The operation continued for so long that even handlights failed due to battery consumption.

.

Return to Interstate Bank Fire Main Page

 

 
 
 
  http://www.iklimnet.com
 
Air Grilles
Air Diffusers
Air Quailty
All Air Systems
All Water Systems
Boilers
Building .Managament Systems ..BMS
Burners
Chillers
Cooling Towers
Cooling Load Calculation
Cryogenics
Energy Saving
Duct
Duct ,Smacna
Dampers ,Air
Dust Collection
Fans
Fire Dampers
Glass Selection
Heating
Heat Exchangers,water
Heat Recovery
Heat Tracing Systems
Hepa Filters
Hvac Applications
Humidifiers / Dehumidifiers
Insulation , Duct
Insulation , Pipe
Insulation , Sound
Nano Tech.,In Building
Occupancy Sensors
Pneumatic Conveying
Piping
Pool Ventilation
Process Piping
Psychrometry
Pumps
Radiant Heating
Refrigerant Systems
Solar Collectors
Sound
Steam Generation
Tables & Charts Gnr.
VAV Sytems
Valves
Ventilation
VRV Systems